Home  Statistics Statistics detail

Energy is required for pumping and treating water

Energy is required for two components of water provision: pumping and treatment (before and after use). Electricity costs are estimated at 5% to 30% of the total operating cost of water and wastewater utilities, but in some developing countries such as India and Bangladesh, it is as high as 40% of the total operating cost.

Last update:06 Feb 2014